From first sketch to front door.
Chad leads the design. Max leads the build. One coordinated conversation from day one.
Two companies. One shared plan.
Three Oaks Design & Build
- Spatial planning
- Revit modeling
- Exterior renderings
- Interior finish schedules
Joint Milestone
- Early preconstruction budgeting
- Value-engineering
- Design to cost alignment
- Permit-ready sign-off
Newhouse Builds
- Permitting
- Trade scheduling
- Subcontractor management
- Construction execution
- Warranty
Design flows left to right: the joint milestone ensures the design you approve is priced and buildable before a permit is filed.
Intake to handover.
- 01
Intake
A shared first conversation with Chad and Max about your land, goals, and budget.
- 02
Design
Schematic design, 3D models, and finish selections with Three Oaks.
- 03
Preconstruction
Joint budgeting and value-engineering before permit submission.
- 04
Permit & Schedule
Newhouse Builds secures permits and sequences the trades.
- 05
Construction
Building as drawn, with design support on-site throughout.
- 06
Handover
Final walkthrough, keys in hand, and warranty coverage begins.
Talk about building with us.
Sit down with Chad and Max together. Bring your land, your ideas, and your questions. We'll map out what design and construction could look like for you.
Design and construction services are provided by separate legal entities under independent contracts.